$45.00
Availability: 235 left in stock

All scheduling software is difficult to learn for a number of reasons. None have the optimal settings when installed and templates, views and default options need to be adjusted to obtain the best possible performance. Usually the Help files do...

  • Name : Create and Update an Unresourced Project using Elecosoft (Asta) Powerproject Version 17: 2-day training course handout and student workshops
  • Vendor : Eastwood Harris Pty Ltd
  • Type : Books
  • Manufacturing : 2024 / 07 / 31
  • Barcode : 9780648635529
Categories:

Guaranteed safe checkout:

apple paygoogle paymasterpaypalshopify payvisa
Create and Update an Unresourced Project using Elecosoft (Asta) Powerproject Version 17: 2-day training course handout and student workshops
- +

All scheduling software is difficult to learn for a number of reasons. None have the optimal settings when installed and templates, views and default options need to be adjusted to obtain the best possible performance. Usually the Help files do not connect the user to real life situations and do not explain the practical use of functions. Furthermore, there are many flicks and switches with obscure names that are difficult to understand or decide what they do or which are important. These issues make learning the software very difficult without a comprehensive guide written by an experienced user. Investing in a book written by Paul E Harris will address all these issues and allow you to setup the software properly and understand all the obscure functions letting you become productive more quickly and enhance your career opportunities and salary with a solid understanding of the software.

This book is designed as a student handout for a two-day training course and may also be used as a self-teach book. This course objectives are to teach participants:

- The user interface,

- How to create a projects,

- Scheduling projects without resources,

- Filters, Views, Sorts and Printing,

- Creating and assigning a baseline and

- Updating an un-resourced project.

Most chapters are reinforced by student workshops.

This book is written by an experienced scheduler, who has used the software at the sharp end of projects and is not a techo. It draws on the author's practical experience in using the software in a wide variety of industries. It presents workable solutions to real day to day planning and scheduling problems and contains practical advice on how to set up the software and import data.



Author: Paul E. Harris
Binding Type: Paperback
Publisher: Eastwood Harris Pty Ltd
Published: 02/20/2024
Pages: 218
Weight: 1.14lbs
Size: 11.00h x 8.50w x 0.46d
ISBN: 9780648635529

Ezra's Archive Does not ship outside of the United States

Delivery Options:

1. Economy: 

Estimated Delivery Time - 5 to 8 Business Days

Shipping Cost - $4.15

2. USPS Priority:

Estimated Delivery Time - 1 to 3 Business Days 

Shipping Cost - $8.85

3. Free Economy Shipping: Only Applicable to Orders over $60

Returns and Refunds: 

Purchased items are not eligible to be returned. However, a refund or item replacement may be granted should an item be damaged or misplaced during shipping. To make a refund or replacement claim please contact us via email at Ezra'sArchive@outlook.com